The Jettyless Floating Terminal (JFT) meets the industry's demand for lower cost and more flexible LNG import and export transfer solutions. 

The JFT unit contains all the required equipment, systems and safety features normally installed on a jetty. It can be adapted for all LNG carriers from small distribution / bunker vessels to the largest existing LNG carriers. Designed to cope with wave conditions, the semi-submersible unit ensures high operational regularity, and requires low operational expenditure, as no propulsion, additional large machinery or manpower between loading operations is required.

As well as transfer to conventional sized LNG Carriers, the JFT has the adaptability to provide safe break-bulk loading to small scale LNG carriers.